All surfaces should be clean, dry and free from dirt, debris and other contaminates. Minimum of 2/3 coats required. Ensure timber is fully dry (allow 3 days) before laying plastic floor tiles, foam and rubber-backed carpets, loft insulation etc. Treatment will typically dry in 1-3 days.